Made in Germany
No nasty surprises: Paint drying ovens and explosion-proof heating chambers from HORO._Headerbild

No nasty surprises: Paint drying ovens and explosion-proof heating chambers from HORO.

When energy and flammable substances get involved with each other, caution is called for. Because if the concentration of a flammable substance – for example solvents from paints – is sufficiently high as a gas, mist, vapor or dust and there is also oxygen (e.g. from the air) in the gas mixture, then an ignition source is enough to trigger an explosion!

And in a drying cabinet or drying chamber, such an explosive situation can quickly arise. Ignition sources in such a system include hot surfaces, static charges, sparks and mechanical impact or friction sparks. Thus, there are several ignition sources in a heating chamber, and these must be adequately secured so that no hazardous situation arises.

Therefore, if in doubt, it is better to opt for an explosion-proofed solution from HORO.

 

Paint drying cabinet in accordance with EN 1539 / BGV D 24: perfecting explosion-proof painting

A paint drying cabinet in accordance with EN 1539 / BGV D 24 is suitable for processing small quantities of explosive vapours and gases. The primary protective measure here is to limit the concentration of explosive substances so that no ignitable gas mixtures are produced.

 

EX-proof heating chamber: when more safety is needed

EX- proofed heating cabinets are needed in case larger amounts of explosive vapour and gases are present or if the cabinet is placed in an atmosphere related to zone 1 or zone 2. A distinction is made between the following designs:

  • EX- proofed working volume inside the heating cabinet installed in a harmless ambient.
  • Installation inside EX- zone 2 or EX- zone 1 with the electronic control outside of EX- zone 2. This is an economic version which does not need any additional measures for the control cabinet outside. The EX- protection is only needed for the components of the heating cabinet.
  • Installation inside EX- zone 2 or EX- zone 1 with integrated control as a compact version or if the area of EX- Zone 2 is extensive.

 

Solutions for all cases – ask us.

If you are looking for a reliable solution to your challenge around explosion protection for drying tasks, then let’s get in touch: We will be happy to discuss with you, without obligation, what options we have to offer you to turn your problem into a solution.

Contact and Directions Mail us